Restoring this Historic Landmark
Central Presbyterian Church stands at the heart of our city.
For more that 140 years, families in Cambridge have worshiped and celebrated in this historic building.
In response to a thorough engineering investigation, it is critical that we:
1
REPAIR
the slate roof
2
REMORTAR
the masonry
3
REINFORCE
the infrastructure
1
Replace and upgrade the roofing system. Engineering studies show urgent repairs are required.- Replace the old slate shingles on the roof
- Replace the slate shingles on the spire
- Replace copper panels on the spire
- Upgrade lightning protection, trim, eaves and chimney
2
Prevent further damage and control moisture by repairing the exterior of our church.- Repoint exterior masonry
- Replace entrance doors
- Replace School Hall windows
- Replace basement windows
- Repair exterior wall of north addition
- Replace windows on the north addition
3
Water leaks and the passage of time have left our sanctuary and interior dated and damaged.- Upgrade plumbing
- Replace the fire alarm system
- Upgrade the kitchen
- Repair sanctuary walls, ceilings, and stairwells
- Replace sanctuary carpet
- Repair and refinish sanctuary pews
We invite you to invest in our heritage, our present and our future.
The Cost?
$2.5 million over a 5-year period.
Every donation helps.
”With God, All THINGS are possible!”
(Matthew 19:26)

Visit our Virtual Tour
News
Restoration Update
May 29 Update The following work has been completed in the last two months: The sidewalk leading to the office door has been replaced with a sidewalk that meets all requirements for a fully accessible entrance to this part of the church. This area has been landscaped...
Restoration Project Update
Although work on the Restoration Project has slowed down in the first quarter of 2022 due to weather conditions, the following work was completed: The scaffolding has been dismantled on the southern façade of the churchand down to the eaves on the western wall. Since...
Project Update
Slate & Stonework Restoration Dec. 31, 2021In the fourth quarter of 2021 the following work has been completed on our Restoration Project: 1. Slating of the spire.2. Copper work for the top 2/3 of the bell tower and adjacent hip rolls. 3. Masonry work on the bell...